Wednesday, September 18, 2019

Advisory Message: Guardrail replacement throughout Malibu; Work hours M-F 6AM-3PM with traffic control for alternating lane closures

Message sent via Nixle | Go to nixle.com | Unsubscribe
Agency Logo
Wednesday September 18, 2019, 4:35 PM

City of Malibu Emergency Services

Advisory: Guardrail replacement throughout Malibu; Work hours M-F 6AM-3PM with traffic control for alternating lane closures

Dear Pepperdine Libboard,

A City contractor will be removing and replacing guardrail systems damaged by the Woolsey Fire at various locations throughout the City during September and October 2019. Work hours are Monday through Friday, 6:00 AM to 3:00 PM.

Work locations include: 
• Encinal Cyn Rd (Avenida Del Mar to Avenida De La Encinal)
• Birdview Ave (Westward Beach Rd to Bluewater Rd)
• Wildlife Rd (Zumirez Dr to Selfridge St)
• Latigo Cyn Tf (PCH to Ocean View Dr)
• Corral Cyn Rd (PCH to Seabreeze Dr)

Flaggers and other devices will be utilized to provide traffic control for alternating lane closures in both directions.


For full details, view this message on the web.

Sent by City of Malibu Emergency Services
23825 Stuart Ranch Rd, Malibu, CA 90265

To manage your email settings, click here. To update your account settings, login here.
If you prefer not to receive future emails, unsubscribe here.

Powered by Nixle Nixle
© 2019 Everbridge, Inc. All rights reserved.

No comments:

Post a Comment